Catching up on October

Here’s the fabrics I got from Tonya the other day…

Over $125 worth and there’s A LOT!! awesome awesome!!

These are all washed and ready to be cut into

Then I’ve worked on a customer’s “monster” quilt – 106″ square, the biggest I’ve done yet, and I think this is my MAX size too, sure made it easy with the red snappers to load the quilt.

Here I quilted stars and meandering all over

Here’s the whole quilt, it is GORGEOUS!

love the star in the middle

Last friday I finished this pineapple quilt for a customer also, I had to ship it to FL, I mailed it so quickly that I forgot to take pictures, so SHE took pics and emailed them to me 🙂

I did free motion gingko leaves and meandering

Each pineapple block was different, it was fun to do

I also just finished this customer quilt- look familiar??

I recently quilt the red and black quilt that used the same pattern

and allover feathers and swirls- she always picks that! 🙂

I forgot I had this playmat/ jungle gym in the closet- another hand me down, so I set it up over the weekend for Sonja, she seemed to like it

Later I moved it into my craftroom/studio, I have a quilt folded underneath, so it’s not so hard and cold to lie there, she was “talking” to the elephant today

The kids made a little paper hat for her too! – DUNCE??

and THESE came in the mail today, baby and mommy owl pin cushions! too cute….Thanks Gwen Z!!

Here’s the collection so far 🙂 the small blue one was the one that started it all, I got this one from Norway and thought a pin cushion swap would be cool, it’s so much FUN!

I forgot to show this picture too, this weekend I moved my fabrics to the opposite wall, one cubbie left for the box of fabrics- which is filled now 🙂

And look! I already cut into the Benartex fabrics… just wait and see, which design I picked from this post. Now I did reply to some of you, that I realized I just ordered half a yard of each instead of a whole yard, so I’ve had to modify SOME things, someone suggested to just buy more fabrics! ha ha

Here’s a review of October projects

 

here’s another update on my 2012 list

#1 welcome to the hive-turned into a pillow DONE!

#2 lotus quilt- DONE!

#3 blue flower table runner- DONE!

#4 pumpkin star pillow- DONE!

#5 red mini star table topper- top done and ready to quilt DONE!

#6 Bunny table runner- DONE!

#7 wonky house block swap- DONE!

#8 giraffe wall hanging – still working on needleturn applique, mommy giraffe almost done

#9 pineapple black and blue quilt- giving these a break now

#10 Blue star quilt- ready to quilt

#11 Pine tree BOM- MARCH is done

#12 Next Stitch STAR- Done!

#13 snowmen table runner- DONE!

#14 Elenar Burns star Go! die- pieces cut for a scrappy look- SCRAPPED!

#15 aqua owl- DONE! and made a pair of hotpads too for a neighbor

# 16 geese in a ring- DONE!

# 17 Bonnie Hunter ORCA mystery – top done- skipping the border- GETTING READY FOR ANOTHER ONE?!

# 18 Little twister blue- SCRAPPED

#19 green, red, yellow flower quilt- top done, just taking forever removing the papers

# 20 small embroidered trees (4 blocks) – DONE!

# 21 spring swap blocks- got plans but no background fabrics ordered yet

# 22 Making memories embroidered panel- needs to be made into a cute wall hanging

# 23 black, red white asian quilt- DONE!

# 24 color block swap- top is done, done and quilted!

# 25 fall leaf blocks swap- ready to quilt

# 26 Baby gingham dog boy quilt- DONE!

#27- a doll apples quilt- DONE!

#28(jan 2012) need to quilt 2 donation quilts- done and mailed off

#29(jan) bubble gum quilt kit won at quilt show – top done adding vine on border

#30 (feb) jelly roll quilt- DONE!

#31 (feb)5 x 1yards of beige/ black batiks- DONE!

#32 (mar) won 9 march BOM -dotted flowers -ready to quilt

#33 (mar) batik quilt for McCalls – DONE!

#34(mar) #2 quilt for McCalls- DONE and shipped

#35 (all year) Round Robin swap -october sent out

#36(mar) Dr seuss baby shower gift- DONE!-gave to neighbor

#37 (april) blue strip pieced blocks – DONE!

#38 (april) won a pattern and two charm bundles- Baby quilt DONE!

#39 wonky block swap -october sent out

#40(may) Civil War Legacies- DONE! extra blocks ready to ship out

#41 (may) blue and white lil’ twister- DONE!

#42 (june) berry squares quilt- DONE!

#43(June)neighbor gave me orange and green brick quilt top- DONE!

#44 (june) – drunkard’s path- top done, may need a border

#45 (June) – Hidden forest- applique- 2 blocks done

#46(June) fabric balls – finished #10!

#47(june) pin cushion swap – sent out october and received november

#48 (July) McCall’s #3 quilt- DONE!

#49 (July) smooth sailing (CT bundle)- ready to quilt

#50(July) Lorax quilt- DONE!

#51( july) geese in a ring- 6 blocks are here

#52 (july) christmas tree skirt- top done

#53(july) hexies- 43 done and sewn together

#54(august) women of the bible quilt blocks- 5 blocks done

#54(september) Boxes!- fabrics arrived

#55 (September)- Woven stars – done!

#56 (September) McCall’s #4 – center of top done, missing border

#57 (September) McCall’s #5 – fabrics are here

#58 (September) roman holiday- kit

#59 (october) mini tumbler- DONE!

#60 (October) Benertex floral quilt- pieces cut and sewing blocks

#61 (October) Valentine’s Round Robin- haven’t started my block, recv’d oct/nov block

6 thoughts on “Catching up on October”

  1. Hillbilly Tonya

    I sure wish I could have been in on your pin cushion exchange. I can't wait to see which design you chose!! And you quilt beautifully 🙂

  2. Log Cabins are so great – one of my all time faves. Your quilting is wonderful.Fun P-cushies. Too cute.

  3. Wow! You have done a tremendous job at finishing up your projects! Love the quilts that you showed us!

  4. That is a gorgeous log cabin star.And little Sonja's smiles are sooo cute!! : )

  5. Fabric Quilt Shop

    You have done such a wonderful job. Everything looks great. Love the new fabric cann't wait to see the finished project.

  6. Wow. Eye candy ovrload. And you'd better get cracking on that Valentine Round Robin block before the queen gets testy. LOL

Comments are closed.

Shopping Cart